☰ Menu

Sandy City Public Works Facility

Sandy City Public Works - House

Client Name

Sandy City

Location

Sandy, Utah

Completion Date

Phase 1 May 2019 | Phase 2 December 2024

Size

6 acres | 79,916 sf

The City of Sandy has seen substantial growth in its demand for public services and determined that its outdated facilities were insufficient to handle the demand increases. Then in 2017, a four‑alarm fire burned down more than half of the Sandy Public Works building.

Galloway was selected to provide needs assessment and master plan, architectural design, interior design, and landscape architecture services for the phased project. The goal of the project was to right-size the facility for staff, equipment, and operations, allowing for future growth. The project was split into two phases:

Sandy City has funded a portion of this project to manage stormwater quality. The city’s investment to reduce the impact of local pollution from the Jordan River, located west of the site, will last well into the future and create a healthier environment surrounding the river. The project is based on low-impact design principles and will be executed with tilt-up construction.

Contact

Jim Child

AIA, NCARB, LEED AP
Principal
Regional Architectural Team Manager

801.533.2100 Contact

Scott Holmes

AAIA
Sr. Associate
Sr. Architectural Project Manager

801.533.2100 Contact

Locations